info@matrikon.com Read More
 
 
  All Downloads
  MatrikonOPC Drivers
  Portal Login
Newsletter Signup Enter your email address to receive updates about new developments.

Ensure Effective APC Implementation for BOC Gases

The end result of this methodology was the commissioning of a reliable, grassroots MPC controller in 12 work weeks rather than the industry standard 4-5 months. The greatest challenge faced in this implementation was neither technical nor operational, according to Matrikon automation and optimization engineer Zul Bandali – it was achieving confidence in the results of the new method.

As published in:

Matrikon in Industrial Automation AsiaIndustrial Automation Asia
Nov 2007

IAA provides an unrivalled breadth of information by focusing on the automation needs of industries across the manufacturing spectrum – from discrete to batch to process. Vertically, the coverage is similarly comprehensive – from sensors and instruments on the factory floor, to control systems, right up to enterprise systems and networks.



Matrikon in ProcessingTalkProcessingTalk
July 2007

Processingtalk is the email newsletter for Engineers and Managers in the process industries.


Get the full Success Story Now!

Details:
Success Story
(1242KB , PDF)
Author: Zul Bandali

Description:
In 2006 BOC partnered with Matrikon, Inc., a veteran of 49 APC implementations at other BOC sites, to apply a radical new methodology using powerful Tai Ji technology in testing and modeling the Hartford plant.






           

 
 

© Matrikon Inc. 2008
Home | Search | Site Map | Total In-Site Login | Privacy Policy | Terms Of Use | Contact